Skip to main content
Product [ ROTARY DROSS COOLER ]

Recover the metal.
Cool the dross. In 15 - 20 minutes.

Indirect rapid cooling that brings hot aluminum dross down to approximately 120°C in 15 - 20 minutes — allowing for recovering 10–30% more of the trapped metal than conventional cooling methods.

Explore the system
01 / The Problem [ DROSS ]

Aluminum's hidden loss.

Every time aluminum is melted, oxygen attacks the surface and turns valuable metal into oxide — a slag-like by-product that traps metal inside its oxide shell, where the casthouse cannot recover it. The longer it sits hot, the more it oxidizes. Without rapid cooling, that metal is lost forever to the slag pit.

  • 01 Material loss per batch (uncooled) 0.3 – 20%
  • 02 Metal lost per minute while dross stays hot ~ 1%
  • 03 Recoverable metal in white dross 15–80%
  • 04 Higher recovery vs. conventional cooling 10–30%
Material lost per batch

0%

Up to 20% of every batch (thin gauge, contaminated scrap) is lost as oxidized aluminum if dross is left to cool slowly under shop-floor air. With rapid indirect cooling, that figure drops to fractions of a percent.

02 / Principle [ HOW IT WORKS ]

Indirect cooling. No contact with water.

Hot dross enters a slowly rotating drum. Heat passes through the drum shell into an external water basin — the metal stays mechanically intact, never wetted, with minimal oxidation losses.

N · IN E · TRANSFER S · OUT W · ROTATION SLOW SPIN
  • 01

    Indirect cooling

    Heat conducts through the drum shell into an external water basin — the metal stays dry and mechanically intact.

  • 02

    Rotation breaks the crust

    Slow tumbling continuously exposes fresh surface, fractures the oxide shell, and releases trapped metal droplets — the recovery step happens inside the cooling cycle.

  • 03

    15 to 20 minute cycle

    From hot skimming temperature to approximately 120°C in one continuous batch. No re-handling, no holding time, no further oxidation losses.

03 / Anatomy [ THREE ZONES ]

One drum. Three working zones.

CETAG Rotary Dross Cooler — machine
04 / Process [ 15-20 MIN CYCLE ]

From skimming temperature to approximately 120°C in 15 - 20 minutes.

t = 0 min

0 °C

Hot in

Dross enters the drum directly from the furnace — metal still trapped inside the oxide crust.

t = 5 min

0 °C

Phase change

Trapped aluminum droplets fall below solidus. Mechanical tumbling cracks the oxide shell open.

t = 15 - 20 min

0 °C

Cooled out

Discharged at approximately 120°C, ready for sorting and direct return to the melting line or for downstream processing.

05 / Specifications [ DATASHEET ]

Technical data.

Throughput

12,000kg/h

Continuous, uninterrupted

Typical cycle

15-20min

Hot to discharged

Recovery

10–30%

More than conventional cooling

Final temp

120°C

Safe discharge

01ModelsCETAG 240–1200
02Throughput range2,400–12,000 kg/h
03Dross per charge600–1,600 kg
04Charges per hour4–7.5
05Cycle time15-20 min
06Final temperature120 °C
07Metal recovery10–30% higher
08Cooling3-way, incl. emergency
09Cooling principleindirect · dry
10Classificationas required
11Outputgranulated, sortable
12Dust controlenclosed charge & discharge
06 / Melt loss [ PER MATERIAL ]

Typical melt loss per input material.

Light Gauge Sheet Scrap

5.0%

Typical melt loss as dross for this input material. The more metal ends up in dross, the more a Rotary Dross Cooler recovers — 10–30% more than conventional cooling.

Lower estimate

2.0%

Higher estimate

5.0%

07 / References [ INSTALLATIONS ]

Reference installations.

RDC 240

Customer in the Czech Republic

Czech Republic — design, fabrication, installation & commissioning

RDC 750

Customer in Italy

Italy — design, fabrication, installation & commissioning

240–1200

Full model range

From 2,400 to 12,000 kg/h, sized to the casthouse

Rotary Dross Cooler — complete system with feeding station and cooling drum
Get started [ NEXT STEP ]

Ready to recover the metal?

Tell us your throughput, alloy mix, and operating context. We'll come back with a feasibility study, sizing proposal, and pricing — first contact within one business day.

Talk to an engineer